The redevelopment of Paternoster Square, London followed a high level campaign which included backing by the prince of Wales to replace the drab 1950’s and 60’s office blocks with building fit to sit in proximity to St. Pauls Cathedral.
CODICUTS carried out all the diamond drilling works on the redevelopment, our trailer rigs can be seen in the pictures stitch drilling 1500mm thick concrete to create lift wells at the start of the building works. Trailer drill rigs are perfect for this work being able to both rapidly set up drill and move the deep holes required and are entirely self sufficient of water and power.